Project of reviewing safety facilities for refuse collection and renewing low carbon refuse trucks

Absrtact
This project carried out from April 18, 2019 to December 31, 2019. The implementation results of this project are as below: For assisting the EPA to solve the problem of the needs with device behind refuse truck for on-board labor, this project cooperated with the of Chiayi City EPB to carry out the demonstration operation to collect the opinions of all parties to review and revise the safety operation specifications of device behind refuse truck for on-board labor. This project also assists EPA continuously to promote the low-carbon collection by redeeming local government 88 electric compression refuse trucks and assist the EPA to review the progress of procurement for the local government by the information management system. Meanwhile, this project also regularly updated the information of types and quantities from the refuse trucks of local governments and various agencies through the common supply contract to reference all units. In order to evaluate of the efficiency of garbage truck transportation, this project collected the weighing information of garbage trucks entering Taoyuan City and Tainan City incineration plants in 2018, calculated the actual carrying capacity of the garbage trucks in the two cities and try to improve the efficiency of garbage truck transportation. This project collected the current status of all-electric garbage truck technology development Domestic and abroad, and preliminarily analyze the projects and procedures of all-electric garbage truck standard test, and evaluate its energy saving and carbon reduction benefits. The project also reviewed the operation results of electric compression refuse truck and other related works.
Keyword
Refuse Truck with Electrical Loading System, Inter-entity supply contract, Electric refuse truck
Open
top